Lathe maintenance procedures
I. Daily Maintenance Content and Requirements
Before Shift:
-
Wipe off dust from exposed guideways and sliding surfaces of the machine tool.
-
Lubricate all parts as specified; oil quantity must meet requirements.
-
Check positions of all handles.
-
Perform a no-load trial run.
After Shift:
-
Clean away all iron chips.
-
Wipe clean all parts of the machine tool.
-
Return all components to their designated positions.
II. Primary and Secondary Maintenance Content and Requirements
1. Appearance
-
Primary Maintenance:
-
Clean the machine’s exterior and hidden corners; remove and wash all covers, ensuring both inside and outside are clean, free of rust and yellow stains; paint should be visible and metal surfaces should be bright.
-
Clean the lead screw, feed rod, and rack; must be free of grease and dirt.
-
Inspect and replenish screws, knobs, and handles.
-
-
Secondary Maintenance:
-
Same as above.
-
Inspect guideways, smooth out burrs, and repair worn or damaged areas as necessary.
-
2. Tool Rest, Crossbeam, Column, Guideway, and Worktable
-
Primary Maintenance:
-
Clean guideways, oil passages, and felt pads; oil passages must be unblocked, felt pads effective, and new oil added.
-
Check and adjust gib clearances.
-
-
Secondary Maintenance:
-
Same as above.
-
Remove the tool rest, clean guideways, unblock oil passages, smooth burrs, check and replace worn parts as needed, and repair worn or damaged areas.
-
Disassemble and clean the worktable; check and replace worn parts as needed.
-
3. Transmission Box
-
Primary Maintenance:
-
Inspect oil quality to ensure it remains good; oil cups must be complete; oil quantity must meet requirements; oil sight glass must be clear.
-
-
Secondary Maintenance:
-
Same as above.
-
Inspect all gearbox transmission mechanisms and replace worn parts as necessary.
-
Inspect and adjust speed change interlocks and positioning devices to ensure correct and reliable operation.
-
4. Lubrication & Hydraulic System
-
Primary Maintenance:
-
Ensure lubrication in all parts, with unobstructed oil passages, clean oil pipes and felt pads, and firmly fixed pipelines; no leakage allowed.
-
Check oil pressure gauge and unloading mechanism.
-
-
Secondary Maintenance:
-
Same as above.
-
Inspect oil pump and pipelines; pipelines must be neatly arranged and oil passages unobstructed; adjust all valves to ensure normal oil pressure.
-
5. Electrical System
-
Primary Maintenance:
-
Clean dust from the motor and inside/outside of the electrical cabinet.
-
-
Secondary Maintenance:
-
Same as above.
-
Overhaul electrical components; disassemble and clean the motor, replace grease if necessary.
-
Overhaul solenoid valves.
-
6. Accuracy
-
Secondary Maintenance:
-
Inspect and adjust to ensure that the main geometric accuracy meets factory standards or production process requirements.
-